Materials Management with SAP ERP: Functionality and Technical Configuration by Martin Murray

Materials Management with SAP ERP: Functionality and Technical Configuration by Martin Murray

Author:Martin Murray [Martin Murray]
Language: eng
Format: epub
ISBN: 978-1-59229-358-2
Publisher: Galileo Press
Published: 2014-07-24T16:00:00+00:00


13.1.2 RFQ Date

Figure 13.1, shown previously, shows the RFQ Date field, which is defaulted with the date of entry but can be overwritten with the appropriate date.

13.1.3 Quotation Deadline

The date entered in the Quotation Deadline field is the date by which the suppliers need to reply to the RFQ with their quotation. This field is mandatory and should be clearly identified to suppliers on the RFQ print or fax document.

13.1.4 RFQ Document Number

The document number, shown by the field RFQ in Figure 13.1, for the RFQ is determined to be either externally or internally assigned. This is defined in the configuration shown in Figure 13.2. The field should be entered if the number assignment is external.



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.